top of page

CARACAS THEATRE

Project overview:

Winner of a design competition to refurbish the town’s main entertainment hub. The Caracas Theatre had been for 50 years the place to go for any large scale cultural event. Growing up in Oliveira de Azeméis, I recall this building with great fondness. My strongest memory was that of the sliding curtain before the beginning of the show. A magic moment of excitement as the performance was about to begin. I brought the curtains to the facade as part of the design concept idea. Entering the building becomes that moment of magic.

Credits:

Project delivered by Broadway Malyan & Eustáquio & Faísca architects.


Our role:

Miguel Sousa was Director of Architecture @ Broadway Malyan
Miguel Sousa was Project Manager and lead designer with the support of Radhie Alfha and Vitor Pais. Eustáquio & Faísca architects developed the construction documentation stage.

Image credits:

All images kindly provided by Câmara Municipal de Oliveira de Azeméis / Original CGIs by Broadway Malyan & LOBA 

WHERE

Oliveira de Azeméis, Portugal

CLIENT

Câmara Municipal de Oliveira de Azeméis

PROJECT YEAR

2017/18

STATUS

Built

bottom of page